OUR HOUSE


Home

Where

The Design

Timber Frame

  • Part 1
  • Part 2

    Clearing

    Excavation

    Well Drilling

    Basement

  • Part 1
  • Part 2

    Framing

  • Outside
  • Inside

    Roofing / Windows / Siding

  • Part 1
  • Part 2

    Plumbing

    Electrical

    Septic System

    Ventilation

    Interior Finishing

  • Part 1
  • Part 2

    Kitchen Cabinets

    Contact List


    Creative Diversion Pottery Studio

  • Interior Finishing - Part 1

    Drywall is all up in the living area.

    The view down the main floor hallway. The stairs going up are on the left and the two bedrooms are in the back. A linen closet it at the end of the hall.

    Drywall is all up upstairs.

    Main floor bathroom. The walls around the tub and in the master bath shower are covered in DenShield before tiling just in case water ever gets back there. The lights on the right are just temporary lighting.

    Mudding the future kitchen....

    ... and the dining room.

    View into the future office from up above.